Skip to content

Halloween Sale 20% off

Custom Gift Haven
Men's Curved Hem Hawaiian Shirt (Model T87) Men's Curved Hem Hawaiian Shirt (Model T87) — photo 2 Men's Curved Hem Hawaiian Shirt (Model T87) — photo 3 Men's Curved Hem Hawaiian Shirt (Model T87) — photo 4 Men's Curved Hem Hawaiian Shirt (Model T87) — photo 5 Men's Curved Hem Hawaiian Shirt (Model T87) — photo 6
4.9 · 201 shop reviews

personalized mens hawaiian shirt with your own design

$13.25

+ delivery to

  • Personalized with your names, dates or photo
  • Made to order and gift-ready

Arrives Oct 29 – Nov 6

Made in 2–5 days · Delivery 2–5 business days

Ships across America & Europe

Checking delivery prices…

Delivery prices aren't available right now; your delivery is worked out at checkout.

Charged at checkout for the country your order goes to. Made to order first, then sent with tracking.

Size:

Upload Your Custom Design *

Not needed: we'll create your design from your text.

Your photo

Still to do before adding to cart:

Size guide

Men's Curved Hem Hawaiian Shirt (Model T87) size chart

May vary by 2–3 cm.

Sizing question? Contact us

Order today, arrives Oct 29 – Nov 6

4.9 from 201 Etsy reviews · 1,000+ gifts made

Men's Curved Hem Hawaiian Shirt (Model T87)

About This Gift

Looking for a personalized mens hawaiian shirt that feels truly special? This men's curved hem hawaiian shirt is made to order with your own custom design, printed all over for a bold look. It is a thoughtful gift for him, whatever the occasion.

Personalized Mens Hawaiian Shirt With Your Own Design

Why It Makes a Perfect Gift

A personalized mens hawaiian shirt suits many gifting moments. Choose it for a birthday gift for him, an anniversary gift for him, or a fun surprise for a husband, boyfriend, father or friend. Its relaxed Hawaiian style suits summer parties, beach days and everyday weekends. It is an easy gift to choose, because the design comes from you.

It also makes a fun Christmas gift or Father's Day gift. Pick an image that means something to him. Then let the all-over print carry it across the whole shirt. A custom Hawaiian shirt for men like this feels far more thoughtful than an ordinary present.

How the Personalization Works

Start by uploading your custom design. The upload is required, so have your image ready before you order. If you want words added, type them into the optional Create My Design box. This personalized mens hawaiian shirt is made to order from your design, so the finished piece is unique to him.

Product Details

  • Style: men's curved hem Hawaiian shirt, an all-over print shirt, Model T87.
  • Recipient: For Him.
  • Fit: designed for men.
  • Material: 90% polyester and 10% spandex.
  • Print: all-over printing, so the design covers the whole shirt.
  • Sizes: S, M, L, XL, 2XL, 3XL, 4XL and 5XL.
  • Personalization: upload your custom design (required), with optional text in the Create My Design box.

Sizes and Fit

With sizes from S to 5XL, you can find the right fit for many men on your gift list. Check your size choice before you order, since each shirt is made to order.

Made to Order and Shipped Worldwide

Every personalized shirt for men is made to order, then shipped worldwide. Gift shoppers in the United States, the United Kingdom, Canada, Australia and beyond can order with confidence. Choose your size, upload your design and place your order.

Order your personalized mens hawaiian shirt today and give a gift he will be proud to wear.

Details

A personalized mens hawaiian shirt printed with your own custom design, made to order in sizes S to 5XL.

Delivery & returns

Every piece is made to order, then sent across America & Europe. Because it's personalized, we can't take returns for a change of mind, but we'll always put it right if something arrives damaged or wrong.

Good to know

Frequently Asked Questions

Look for the personalization section on the product page. That's where you give us the names, dates, wording or photo for that particular gift, and you fill it in before the gift goes in your cart. Whatever you type is what we make, so read it through first.

Yes. Choose your gift, personalize it and pay at our secure checkout, all on this site. If you're more comfortable buying on Etsy, you'll find our shop there too.

It depends on the gift, because nothing is made until you order it. Look on the product page for a delivery estimate, which adds that gift's production time to the tracked shipping time.

Yes. We ship within the USA and internationally. At checkout you'll see each delivery option and its price.

Send us a message saying what you'd like to check, and we'll help you with it.

Message us as soon as you notice. Tell us your order number and how the details should read. Until your order goes into production, we'll try to make the change. After that, it can't be altered.

Reviews

4.9

Based on 201 reviews of our Etsy shop

See them on Etsy
Sufia
Sufia AI assistant